Final Environmental Impact Report
October 19, 2011 - The Planning Commission for the City of Whittier will conduct a public hearing starting at 7:00 p.m. to consider the Final Environmental Impact Report (FEIR) and the Conditional Use Permit for the Whittier Main Oil Field Project. The meeting will be held on Wednesday, October 19, 2011, at the Whittier Radisson Hotel Ballroom, located at 7320 Greenleaf Avenue.

If you have any questions, please contact:

Jeff Adams
Community Development Department
City of Whittier
13230 Penn Street
Whittier, CA 90602

Click on the links below to read the Whittier Main Oil Field Development Project Final Environmental Impact Report (FEIR).

Executive Summary
Inside Notebook Cover
Notebook Cover

  1. Introduction
  2. Project Description
  3. Cumulative Projects Description
  4. Environmental Analysis
    1. Air Quality
    2. Biological Resources
    3. Safety Risk of Upset and Hazardous Materials
    4. Geological Resources
    5. Noise and Vibration
    6. Aesthetics and Visual ResourcesR2
    7. Transportation and Circulation
    8. Hydrology and Water Resources
    9. Cultural Resources and Archeology
    10. Wastewater
    11. Land Use and Policy Consistency Analysis
    12. Fire Protection and Emergency Services
    13. Public Services and Utilities
    14. Recreation
    15. Energy and Mineral Resources
    16. Environmental Justice
  5. Alternatives
  6. Comparison of Proposed Project and Alternatives
  7. Other CEQA-Mandated Sections
  8. Summary of Mitigation Measures and Mitigation Monitoring Plan
  9. List of EIR Preparers
  10. Agencies and Individuals Consulted During EIR Preparation

Appendix A Project Desciption Design Data R2
Appendix B Air Emission Calculations R2
Appendix C Biological Reports
Appendix D Risk Assessment Calculations R2
Appendix E Traffic Impact Analysis 7_2011
Appendix F Cultural Resources Survey Report
Appendix G Summary of Oil and Gas Development Regulations in Other Southern California Jurisdictions
Appendix H Socioeconomics
Appendix I NOP, Scoping Document, Comments, and Responses
Appendix J References
Appendix K List of Abbreviations and Acyonyms
Appendix L Soil Engineering and Engineering Geology Investigation
Appendix M Comments and Responses
Appendix N Public Notification List
Appendix O Potential Project Design Modifications Assessment